The Art of Commissioning | Integrated Designs





In “Zen and the Art of Motorcycle Maintenance” by Robert Pirsig we learn that taking the roads less travelled is infinitely more rewarding that sticking with tradition. In this book that is an inquiry into values and quality we discover an import truth that applies to the commissioning process.


Until it is Tested the Design is not True

We know this statement to be true as in a recent survey we found out that buildings are still guzzling energy and operators are extremely stressed having to deal with buildings “full of half dead zombie controls that arise in the night.” The result of not properly implementing the commissioning process.


Commissioning needs to be a PROACTIVE process that begins at the front end of a project and takes it through to verification of PERFORMANCE and VALUE. When properly integrated into the design and construction process it also means more PROFIT as it becomes a way more efficient process.

The LeanCX commissioning approach is based using  a new whole way of thinking. It takes a collaborative team effort that is disciplined in eliminating waste, proactive in workflow planning and committed to getting to the finish line early.

  • Expand the Little Black Box called Commissioning, Get Involved Early
  • Implement a Disciplined Testing Program based upon lean production practices
  • Collaborate with the Team to Get Done Early




By integrating quality control into the building process through commissioning we can improve the quality of designs and construction and prevent the mirage of change notices and rework that result from incomplete designs and turnover of systems that have never been completed or tested to verify performance.


By taking a proactive approach we can demonstrate commissioning creates value. Less rework and call-backs for contractors leading to higher profit, achieving energy savings early and getting what was paid for the Owner and less risk of non-performance for designers.


For a presentation on Commissioning for Profit, Productivity and Performance

For a Commissioning Workshop please contact Murray Guy mguy@i-designs.ca

Contact  .... Murray Guy aka @Lean_tobe_Green

Online Training LEAN LAB
Commissioning Services:  Integrated Designs
NetZero Home Building: EcoSmart  

Friday, February 5, 2016

LeanCx 401 | The Art of Commissioning | Workshop






In “Zen and the Art of Motorcycle Maintenance” by Robert Pirsig we learn that taking the roads less travelled is infinitely more rewarding that sticking with tradition. In this book that is an inquiry into values and quality we discover an import truth that applies to the commissioning process.

Until it is Tested the Design is not True


We know this statement to be true as in a recent survey we found out that buildings are still guzzling energy and operators are extremely stressed having to deal with buildings “full of half dead zombie controls that arise in the night.” The result of not properly implementing the commissioning process.


Commissioning for lean projects (LeanCx) requires a new whole way of thinking. It takes a collaborative team effort that is disciplined in eliminating waste, proactive in workflow planning and committed to getting to the finish line early. In the introduction we will establish the principles and practices as well as business case for LeanCx.




  • Establish the Business Case for Lean Cx
  • Begin with the End in Mind: What defines the last Milestone?
  • How to Expand the Little Black Box called Commissioning
  • Pull Planning: Getting to Done is Done
  • Implement a Disciplined Testing Program 
  • Pass Go, Collect your Extra Pay check




By integrating quality control into the building process through commissioning we can improve the quality of designs and construction and prevent the mirage of change notices and rework that result from incomplete designs and turnover of systems that have never been completed or tested to verify performance.


By taking a proactive approach we can demonstrate commissioning creates value. Less rework and call-backs for contractors leading to higher profit, achieving energy savings early and getting what was paid for the Owner and less risk of non-performance for designers.


If you are interested in learning how to facilitate the implementation of the LeanCx process, please contact Murray Guy for information about a LeanCx work shop. mguy@i-designs.ca

Contact  .... Murray Guy aka @Lean_tobe_Green

Online Training LEAN LAB
Commissioning Services:  Integrated Designs
NetZero Home Building: EcoSmart  

Sunday, January 31, 2016

Deming on Quality | Murray Guy





The philosophy of W. Edwards Deming has been summarized as follows:
"Dr. W. Edwards Deming taught that by adopting appropriate principles of management, organizations could increase quality and simultaneously reduce costs (by reducing waste, rework, staff attrition and litigation while increasing customer loyalty). 

The key is to practice continual improvement and think of manufacturing as a system, not as bits and pieces."[20]

In the 1970s, Dr. Deming's philosophy was summarized by some of his Japanese proponents with the following 'a'-versus-'b' comparison:
(a)   When people and organizations focus primarily on quality, defined by the following ratio, quality tends to increase and costs fall over time

QUALITY = Results of Work Efforts/Total Cost

(b)   However, when people and organizations focus primarily on costs, costs tend to rise and quality declines over time.
http://en.wikipedia.org/wiki/W._Edwards_Deming

In the building industry this same formula holds.  By integrating quality control into the building process through commissioning we can improve the quality of designs and construction and prevent the mirage of change notices and rework that result from incomplete designs and turnover of systems that have never been completed or tested to verify performance.

For training or a workshop on HOW to integrate quality or lean into your projects 

Related Articles:  Retro-Commissioning  | Agent Cx | LeanCx


Contact  .... Murray Guy aka @Lean_tobe_Green

Online Training LEAN LAB
Commissioning Services:  Integrated Designs
NetZero Home Building: EcoSmart  





Saturday, January 30, 2016

The Cx Agent will discover ... What is draining your PROFIT?

Performance INVESTIGATION Update


Is something draining your Profit?   
Did you know Retro-commissioning has a 50% ROI?




With the latest BUZZ about smart grid, intelligent buildings, virtual commissioning, living buildings, Net 0 and LEAN Project Delivery we decided it was time to investigate what is shaking in the building industry from a commissioning perspective. ............  Are the commissioning AGENTS, getting the job done?

When we last did a check on the building industry  we found building were still guzzling energy and operators were extremely stressed having to deal with buildings “full half dead zombie controls that arise in the night” Our mission is to separate the hype from reality and report on how real value is being created in the building industry. We wanted to discover from "the agents" how to progress to a new level of  building intelligence.  

What we have learned! 

Since the 90’s, commissioning has become more widely adopted because it is a mandatory process for LEED certification. Some Owners recognize the value of commissioning but most treat it as a commodity and select this service based upon low cost. How unfortunate!

Is there a Business Case for higher levels of Commissioning?


It is unfortunate that the industry does not recognize that Cx provides one of the best returns on investment. Based upon studies by Lawrence Berkley Laboratories the returns get better for the more intensive technical commissioning that takes time and effort.  If we take that to a whole new level and be real PROACTIVE with Lean Commissioning (LeanCx) we can get projects done 6 month early and realize a 500% return on investment.


Find out more about this from the Murray &  Gary's  LeanCx presentation in Boston title "Commissioning for Productivity, Performance & Profit" or arrange a Workshop for your Team 





Show me the Money!


This perception is changing, as there are more success stories like the University of Illinois that adopted commissioning as a strategy to fund budget gaps.  By implementing a comprehensive retro-commissioning program they were able to reduce energy costs by $350,000 to $500,000 per year for each of four facilities.  This investment yielded average paybacks for commissioning of 1.1 year or approximately a 100% ROI based upon energy savings alone.

Why do you need a Columbo?

Agents need to be confident enough to challenge the team to do their best work, persistent in ensuring project requirements are achieved and have an uncanny knack for convincing the team that they will be more successful working collaboratively to rid the project of half dead zombie controls.

Forensics will discover the truth!

A comprehensive testing program is key for discovering the truth about performance. Systems need to be tested to ensure the team has delivered the intended performance before they collect their final pay checks and head out the door.  

The Future of Commissioning 

For commissioning to become recognized for the VALUE it brings to a project, performance management needs to become everyone’s business. We need to expand the little black box they call Commissioning at the end of a schedule if we want to get done  4 to 6 months early.

Commissiong Agents are Unsung Heroes on a project?

A common theme emerged when investigating with Owners, Designers, Operators and Contractors the future of high performance buildings. They all verified that the Agent was invaluable in pulling the team together to achieve great things.   




For the owner it was technical expertise and the opportunity to reduce the risk and stress of non-performance that provided real value; 


For the operators it was the mentoring and the high involvement and the avoided stress associated with deficiencies; 


For the contractors, it was the communications and the improved coordination that helped them achieve Lean construction schedules; 


For the designer it was avoidance of the embarrassing change notices and non-performance issues.

With all this value being created it makes me wonder if the Agent is one those many unsung heroes on a project.    Just maybe together we need to change that as an industry!

Murray Guy @Lean_tobe_Green
mguy@i-designs.ca

LeanCx | Commissioning for Performance, Productivity and Profit



Our Okanagan College project team introduced the concept of LeanCx as a proactive commissioning process that enables teams to get achieve performance objectives early. We call this "Getting to Done is Done."     





By eliminating the typical six months of commissioning that occurs after substantial completion that often stresses customers and eats up profit, we can demonstrate that taking a proactive lean approach can provide up to a 500% return on investment.

This requires expanding  the Little Black Box that we call commissioning and fully integrate performance management into the project from start to finish.
We offer a LeanCx Workshop on how to integrate commissioning into your project from start to finish.







The lean commissioning process (LeanCx) is outlined  in a guide “Commissioning for Lean Project Delivery.”   The system that takes quality, performance and workflow productivity to a whole new level.   The LeanCx process is currently being implemented on both the Okanagan College Trade Center in Kelowna and on the Mosaic Centre in Edmonton both, which are Living Building Challenge/Net Zero projects.   Lean Commissioning Guide

There is a business case for more proactive , hands on and higher levels of commissioning. The returns are drastically improved performance and higher profitability by getting to Done is Done.

What's in it for me?


Quality management was key in enabling Toyota to transform the automobile industry. Similarly commissioning has the potential to take quality, productivity and performance management to a whole new level for the building industry.
  • Lean Projects can deliver high performance GREEN building at very little if any additional capital cost.
  • Proper integration of the commissioning into a project will drastically improve workflow, productivity and profit.
  • A proactive and collaborative approach to commissioning (LeanCx) is key to achieving quality management, team productivity and building performance.
  • Hands on “Technical Commissioning” provides the best investment for achieving performance.
  • Commissioning is a Project Managers best investment in mitigating the risk associated with non-performance.
NetZero Projects: Learn Online LEAN LAB. Design Integrated Designs or Build EcoSmart